Water and Sewer 9/2/25
-
Tuesday,
September 2, 2025
6PM – 7 PM
Minutes
Draft
Minutes
Printable version
Web version
Town of Richmond
Special Meeting of Water and Sewer Commission
Minutes of September 2, 2025
Members Present: Bard Hill, Erin Farr, Jay Furr, David Sander, Morgan Wolaver
Members Absent: None
Staff Present: Superintendent Steve Cote; Town Manager Josh Arneson; Deputy Town Manager Duncan Wardwell
Others Present: The meeting was recorded for MMCTV Erin Wagg
MMCTV Video: MMCTV Erin Wagg
https://youtu.be/rGEX3xBWqEM?si=9UyhDvwCoeMjBz2q
Call to Order: 6:00 pm
Welcome: Wolaver
Public Comment: None
Additions or Deletions to the Agenda: None
Approval of Minutes, Warrants and Purchase Orders
Minutes:
Furr moved to approve the minutes of August 18, 2025. Hill seconded.
Roll Call Vote: Hill, Farr, Furr, Sander, Wolaver in favor. Motion approved.
Purchase Orders: None
Warrants:
Sander moved to approve the Warrants as presented. Hill seconded.
Roll Call Vote: Hill, Farr, Furr, Sander, Wolaver in favor. Motion approved.
Items for Presentation or Discussion with those present
Consideration of setting a date to hold a special meeting to review the following items related to the Wastewater Treatment Facility 20 Year Study: 1) the Preliminary Engineering Report 2) review funding options and 3) pump station and force main flood mitigation
Timestamp: 0:02
Arneson reviewed that this crosses over two different projects with each of the 3 topics: 1) the Preliminary Engineering Report 2) review funding options and 3) pump station and force main flood mitigation
Furr moved to hold a special meeting on Tuesday, October 7, 2025 at 6pm to review the Preliminary Engineering Report and to review funding options for the Wastewater Treatment Facility 20 Year Study. Hill seconded
Roll Call Vote: Hill, Farr, Furr, Sander, Wolaver in favor. Motion approved.
Wolaver suggested sharing the spreadsheets a week before so the Commissioners can review them.
Consideration of approving a change order to the engineering for the 20 year study
Timestamp: 0:08
Arneson stated that there is a wetland piece that they want to add to it. They will look at it next meeting.
Update on easement obtainment for the Tilden Ave., Bridge St., and Cochran Rd. Waterline Replacement Project
Timestamp: 0:09
Cote confirmed that they have 3 easements signed and a couple more ready to go. Cote has a list and will make copies that he can send around to help collect the other easements. Cote stated that someone wants a second curb stop it would be the same easement.
Discussion of installing additional curb stops during the Tilden Ave., Bridge St., and Cochran Rd. Waterline Replacement Project including explanation of how a curb stop functions
Timestamp: 0:15
Cote stated that there might be other people who want an additional curb stop that do not have an easement. Arneson suggested sending out a letter to list the bid and explain the process that it does not guarantee an allocation.
Cote demonstrated the components of a curb stop from a water line. Ideally, the curb stops are put in the right-of-way, but Tilden Ave is so small they cannot keep them all in that area. Cote estimated it would cost $350 to install a curb stop and housing over it.
Superintendent’s Report
Timestamp: 0:47
Cote reviewed that Erin Kelley started today, she is from Montpelier and graduated Magna Cum Laude from UVM Environmental Science.
Cote confirmed that they successfully patched the day tank.
Cote stated that they have been taking about 38,000 gallons in septage a day.
Cote stated that all the water meters are installed. Wolaver suggested notifying everyone when they can go online to monitor their water.
Discuss Items for Next Agenda:
-Informational meetings for 20-year upgrade
Adjournment
Furr moved to adjourn. Sander seconded.
Roll Call Vote: Hill, Farr, Furr, Sander, Wolaver in favor. Motion approved.
Meeting adjourned at: 6:54 pm
Chat file from Zoom: None
Agenda
Printable version
Web version
Town of Richmond
Special Meeting of the Water and Sewer Commission
TUESDAY September 2, 2025
Richmond Town Center Meeting Room, 3rd Floor – 203 Bridge Street, Richmond, VT
Meeting may also be joined online or by phone
Join Zoom Meeting Online:
us02web.zoom.us/j/84230586737
Join by Phone: +1 929 205 6099 Meeting ID: 842 3058 6737 Passcode: 559919
Agenda
6:00 PM 1. Welcome and Public Comment
6:02 PM 2. Additions, Deletions, or Modifications to the Agenda
6:05 PM 3. Approval of Minutes, Purchase Orders, and Warrants*
a. Minutes of 8/18/25
6:10 PM 4. Items for Presentation or Discussion with those present
a. Consideration of setting a date to hold a special meeting to review the following items related to the Wastewater Treatment Facility 20 Year Study: 1) the Preliminary Engineering Report 2) review funding options and 3) pump station and force main flood mitigation* (5 min)
b. Consideration of approving a change order to the engineering for the 20 year study* (10 min)
c. Update on easement obtainment for the Tilden Ave., Bridge St., and Cochran Rd. Waterline Replacement Project (5 min)
d. Discussion of installing additional curb stops during the Tilden Ave., Bridge St., and Cochran Rd. Waterline Replacement Project including explanation of how a curb stop functions # (10 min)
e. Superintendent’s Report (15 min)
6:55 PM 5. Discuss Items for Next Agenda and Adjourn
Time is available at each meeting for public comment.
If you would like to schedule a time with the Commission or need assistance to participate in the meeting, please call
Josh Arneson, Richmond Town Manager at 434-5170 or jarneson@richmondvt.gov
Links to videos of Water and Sewer Commission meetings can be found at mtmansfieldctv.org
Documents related to this meeting can be found at: www.richmondvt.gov/documents/water-sewer-commission-meeting-documents/
*denotes action item # denotes item(s) included in packet