Richmond Post Office Ramp and Concrete Blocking
VIEW FULL BID PROCESS
The Town of Richmond is seeking a qualified contractor to repair the concrete blocking on the east wall along Post Office ramp
Description of Project
The concrete block foundation on the east wall of the Town Center building, along the ramp is deteriorating due to the salt used to melt the ice in the winter.
AN OPTIONAL SITE VISIT WILL TAKE PLACE ON
WEDNESDAY, JULY 22 at 12 PM
203 Bridge St., Richmond, VT
Proposals will be opened and read aloud at 12:00pm on July 29, 2026
in the Town Center Meeting Room 3rd Floor and via Zoom
VIEW FULL BID PROCESS
